Newsletter Sign Up
Stay updated on news, articles and information for the rail industry
Stay updated on news, articles and information for the rail industry
Rail News Home
Passenger Rail
Rail News: Passenger Rail
4/4/2012
Rail News: Passenger Rail
Foothill extension authority green lights work on light-rail alignment

advertisement
Yesterday, the Metro Gold Line Foothill Extension Construction Authority issued a full notice to proceed to Foothill Transit Constructors to begin designing and building the $486 million light-rail alignment from Pasadena to Azusa, Calif.
The Kiewit Parsons joint venture now will launch all aspects of the design-build contract, including the design and construction of 11.5 miles of track, stations, crossings, bridges, utilities and a maintenance facility, authority officials said in a prepared statement.
The project’s total budget is $735 million. Construction is slated for completion in 2015.
Two conditions had to be met prior to the notice being issued: BNSF Railway Co.’s abandonment of the rail right of way west of Irwindale, which was completed in February; and full control over more than half of the land required for the maintenance facility, which was met late last month, authority officials said.
The $1.4 billion Metro Gold Line Foothill Extension project is partially funded by Los Angeles County’s Measure R. The extension is undergoing final design and construction for the Pasadena-to-Azusa segment, and environmental review for the Azusa-to-Montclair segment.
The Kiewit Parsons joint venture now will launch all aspects of the design-build contract, including the design and construction of 11.5 miles of track, stations, crossings, bridges, utilities and a maintenance facility, authority officials said in a prepared statement.
The project’s total budget is $735 million. Construction is slated for completion in 2015.
Two conditions had to be met prior to the notice being issued: BNSF Railway Co.’s abandonment of the rail right of way west of Irwindale, which was completed in February; and full control over more than half of the land required for the maintenance facility, which was met late last month, authority officials said.
The $1.4 billion Metro Gold Line Foothill Extension project is partially funded by Los Angeles County’s Measure R. The extension is undergoing final design and construction for the Pasadena-to-Azusa segment, and environmental review for the Azusa-to-Montclair segment.