Media Kit » Try RailPrime™ Today! »
Progressive Railroading
Newsletter Sign Up
Stay updated on news, articles and information for the rail industry



This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.




railPrime
View Current Digital Issue »



Rail News Home Maintenance Of Way

12/7/2012



Rail News: Maintenance Of Way

Alameda Corridor authority seeks construction management consultant for two grade separations


advertisement

The Alameda Corridor-East Construction Authority (ACE) has issued a request for proposals seeking qualified consultants to provide construction management services for the Fairway Drive and Puente Avenue grade separations. Proposals are due Jan. 15, 2013.

Estimated to cost $106.1 million, the Fairway Drive grade separation calls for lowering the roadway under two existing Union Pacific Railroad and Metrolink tracks in the city of Industry and unincorporated area of Los Angeles County, Calif. A four-lane roadway underpass, retaining walls, a new rail bridge with two tracks and, potentially, one future freight-rail track would be constructed.

Estimated to cost $87.5 million, the Puente Avenue grade separation would involve constructing a roadway underpass with bridges for Valley Boulevard and UP tracks, and building a loop connector road in Industry, Calif.